InterlockingRock PANELS InterlockingRock TILES InterlockingRock BLOCKS
MODULE SIZE MODULE SIZE MODULE SIZE
32" H x 32" W x 1" maximum relief 16" H x 16" W x 1" maximum relief (1/4 size of panel) 24" W x 32" H x 5-7" D
DESIGN SCALE DESIGN SCALE DESIGN SCALE
Large, dramatic scale, designed for high visual impact in larger areas where viewer is more distant. Our panel product is intended for commercial projects or larger spaces. Smaller shapes, tighter texture, same relief depth. Designed for sculptural drama in more intimate spaces where viewer is in closer proximity. Our tile product is suited for small spaces (areas of about 8' x 12' or less). Large, dramatic scale, designed for high visual impact. Fully dimensional, double-sided. Voids in the design allow some degree of light and transparency through wall.
APPLICATIONS APPLICATIONS APPLICATIONS
Commercial locations, large interiors, lobbies, offices, nightclubs, restaurants, retail, hotels, feature walls, etc.
Curved walls: We can cast curved panels to match any radius 8 feet or larger. Please contact us for pricing and lead-time details.
Smaller spaces, hotel rooms, residences, kitchens, backsplash, small feature walls in intimate spaces. Blocks become a full height, highly dimensional partition screen wall, either free-standing or abutting existing walls. Commercial locations and dramatic interiors, lobbies, nightclubs, retail, hotels, offices, etc.
INSTALL SUMMARY INSTALL SUMMARY INSTALL SUMMARY
INSTALLATION TIME: Approximate 1 man-hour per panel. Experience may shorten.
INSTALLER SKILL LEVEL: Finish Carpenter/Millworker/Drywall Tradesperson
  • Panels are screw-mounted through the face to the substrate (typically drywall).
  • All panel-to-panel edges are glued with approved adhesive as panels are mounted.
  • Seams are filled with the approved spackling compound.
  • Seams are sanded.
  • Surface is sealed with the approved primer/sealer.
  • Desired finish paint is applied (flat recommended).
INSTALLATION TIME: Approximate 1/2 man-hours per tile. Experience may shorten.
INSTALLER SKILL LEVEL: Tile Installer or Finish Carpenter
  • Tiles are screw-mounted to the wall through the two mount-points on each tile.
  • All tile-to-tile edges are caulked with supplied tile caulking as they are mounted.
  • Seams are filled with the supplied color-matched spackling compound (soft white).
  • Seams are sanded.
  • Surface is sealed with the supplied primer/sealer. Paint is optional.
INSTALLATION TIME: Approximate 1.5 man-hour per block. Experience may shorten.
INSTALLER SKILL LEVEL: Finish Carpenter/Millworker/Drywall Tradesperson
  • Blocks are assembled with a standard steel stud and track system.
  • Every two vertical columns of blocks require one footing part, which acts as a base for the blocks, and a face onto which you may apply a desired baseboard or trim.
  • Blocks are glued at the adjoining edges as they are assembled.
  • Seams are coated with the prescribed filler and sanded.
  • Blocks are sealed with the prescribed sealer and finish painted with a color of your choice.
FINISH FINISH FINISH
Two coats minimum of sealer, one to two of finish paint required (flat finish recommended). Professional paint spray equipment preferred (sealer supplied with install kit). Brush-on supplied clear stone sealer (for a natural white color). Paint if desired, flat finish recommended. (for details on finish, review installation instructions. Sealer supplied with install kit). Two coats minimum of sealer, one to two of finish paint required (flat finish recommended). Professional paint spray equipment preferred (sealer supplied with install kit).
PACKAGING PACKAGING PACKAGING
Wooden crates. Must ship freight. Forklift or pallet jack at receiving location required. Power driver to remove crate screws. Boxes of six. Parcel carriers. Freight for six or more boxes. Hand truck (dolly) preferred at receiving location for multiple boxes. Wooden crates. Must ship freight. Forklift or pallet jack at receiving location required. Power driver to remove crate screws.
STORAGE STORAGE STORAGE
Limited time in crates, store in controlled environment. Acclimate to install space for 24 hours prior to install. Unlimited. Store in dry environment. Store in controlled environment. Acclimate to install space for 24 hours prior to install.